Yesterday, the guys poured and finished the gallery floor.
Rich installed the first three window frames!
This morning, Rich installed more windows, and the guys worked on finishing the cement work around the windows.............
and smooth plastering the north outside wall of the house.
It's looking great!
Sunday, March 16, 2008
Windows!
Posted by 4Him-in-Mole at 1:57 PM
Subscribe to:
Post Comments (Atom)
2 comments:
The drive on the side/front of the hospital looks so amazing!! I'm so impressed. Thanks for the pictures. :)
Jessica
I love all the pics
Post a Comment